Design and construction principles

ripage

Modularity to favor reproducibility: a grid of 12.59 m to modulate prefabrication and installation
A construction system to build without interrupting highway traffic.

The solution drafted for the Fully case includes 2 * 126 concrete foundations of roughly 1.5 cubic meter each protected by 2 walls of 1574 meters each with 1 meter in earth and 1.3 meter aerial part and thickness of 45 cm. This guaranty a 100% protection of the pillars even in a worst case scenario.

Choice of solar panels and other electrical key components : to be advised at work start