Project characteristics

  • Motorway affected length: 1574 M +/- 1m
  • Solar panel number: 36’000
  • Solar module type: SVG400 version 420W -0 +3%
  • PV field surface area: 73‘600 m2
  • Final power: 15.1 MWp
  • Annual anticipated  production: up to 19 GWh
  • Project maximal expected cost: CHF 50‘000’000.– HT

Present project status

  • Building permit
  • Financing final stage
  • Location:  Fully, VS, Switzerland
  • Duration of construction: 8 months
  • Commissioning: third quarter 2019
  • Life expectation: 100 years, photovoltaic modules 35 years