Skip to main content

EnergyPier power plant

The combined power plant

The EnergyPier power plant combines solar generation, airflow generation and infrastructure benefits in one integrated motorway structure.

Concept

Sun, wind, externalities+

EnergyPier combined power plants produce green electricity and generate additional benefits for motorway operators and users.

  • 1

    Sun

    Thousands of square metres of solar modules produce large quantities of clean electricity.

  • 2

    Wind

    Airflow accelerated by the supporting structure is converted into green electricity by EnergyPier AnemoGen vertical generators.

  • Externalities+

    The structure reduces noise, winter maintenance and excessive road heating, with further benefits for motorway operators and users.

EnergyPier diagram showing solar modules at point 1, AnemoGen wind generators at point 2, and the motorway canopy

Positive externalities

Beyond power generation

The structure improves the motorway environment, protects the road and supports additional services.

  1. Noise reduction

    The security barrier and canopy act as sound insulation, reducing disturbance for nearby communities.

  2. Winter maintenance

    The canopy protects the road from snowfall, eliminating or greatly reducing salting and snow ploughing.

  3. Road surface protection

    Shade protects the pavement from excessive heat and UV rays, extending its service life.

  4. Rainwater collection

    The slanted overhead surface allows rainwater to be collected.

  5. Cables and conduits

    The supporting structure can accommodate cables and other conduits.

  6. E-mobility charging

    The structure can accommodate emergency charging points for electric vehicles.

Sustainable innovation

Four sustainable innovations

Innovation #1

Technical research

R&D and technical research: achieve a high level of innovation while applying only well-proven technologies to assure both the security and longevity of the structure and to avoid costly and time-consuming teething problems.

Technical model of the EnergyPier motorway structure

Innovation #2

Construction over motorways

Constructing over motorways without interrupting the flow of traffic by adapting existing proven construction techniques.

Bridge construction using a launching gantry to install prefabricated concrete spans

Innovation #3

Landscape integration

Blending the infrastructure into the landscape: upgrade the motorway's basic mobility function into a multifunctional tool, thus creating additional benefits without creating additional negative impacts.

Rendering of the EnergyPier structure integrated into the A9 motorway landscape at Fully

Innovation #4

Combined power plant

A combined power plant, achieving the optimal cost/performance balance: it is the combination of high performance solar cells with the EnergyPier AnemoGen air turbines that will result in an optimal cost per kWh.

Draft illustration of an EnergyPier AnemoGen unit with its helical rotor
EnergyPier AnemoGen unit with a helical rotor.

Environmental balance sheet

Environmental balance sheet

The environmental balance sheet anchors the project in a broader goal: contributing to prosperous and sustainable economic growth.

A solid evaluation can be built by comparing energy invested with energy produced, gray-energy savings and the ancillary environmental effects generated by the structure.

Invested-energy and saved-gray-energy ratios are largely positive in both continental and warm-climate locations.

  • Non-existent chemical emissions
  • Noise emissions reduced by 5 to 8 dB
  • Visual exposure integrated into the landscape
  • Grid management support for sustainable energy
  • Wildlife impact tending to null
  • Very light construction, decommissioning and recycling emissions

2020-2035

The development of the Swiss market

Switzerland must compensate for reduced nuclear and thermal production while meeting new electrical needs from decarbonated mobility, heating and telecommuting.

In 2019, renewable production excluding hydroelectricity amounted to 3 TWh/year. Even with rapid growth, the 25-35 TWh/year threshold will require additional production sources.

EnergyPier plants are an important complementary solution. With an average plant size comparable to A4-KW Knonauer Amt, around 250 plants would be required across the Swiss motorway network.

Global perspectives

Infinite global perspectives

In addition to its commitment to Switzerland, the EnergyPier team is planning international deployment.

The team first plans to consider neighbouring European countries, then set up local collaborations in regions with essential needs and favourable climatic conditions.

Successive EnergyPier projects could lead to a Swiss combined power plant industry with global reach.

See the Swiss pilot projects

Explore the Fully VS and Knonauer Amt ZH-ZG demonstration plants.

View projects