Motorway A9 - Commune of Fully, Canton of Valais
EnergyPier power plant in Fully - VS
Characteristics
- 47,000 solar panels if size is 1.6 m2, or 36,576 panels if size is 2 m2
- Up to 508 EnergyPier AnemoGen vertical turbines
- 250 pillars
- PV surface area of approx. 76,800 m2
- Projected PV power of approx. 19 MWp
- Solar power production of 20+ GWh/year
- Air turbine production of 30+ GWh/year
- More than 60,000 m2 of motorway pavement protected
- Construction duration of 8-12 months